And now for a little terra forming
Monday has come and Marcial who is one of the tractor operators for Ferremax is due. Cecilio has requested that the holes be dug for the septic tank and grease trap. The grease trap goes on the line from the kitchen sink and does exactly what it says, trap the grease.

The hole for the septic tank is done.

Marcial smoothes out that 7 1/2 foot difference between where the grass is and that pile of rubble to the right.

This give a better idea of what is going on.

This view looking north shows the slope that was cut. The pile of dirt to the left will be spread out so that grass can grow.

This picture was taken while standing in the patio. The view is towards the northeast. This shows where the dirt was shaved off to lessen the slope.

All done. Now to spread that top spoil. Hmmm.

Yes, we did encounter a rock. This one now graces the side of the ramp on the south side of the house.