The pump house gets its roof
Today the roof got finished on the pump house. Most of the internal electrical conduit has been placed also.

This looking south from just outside the patio. You can see fresh repello on the walls of the pump house and around one of the sliding doors which leads into the great room. To the right is the fireplace chimney.

This shot is a little to the left of the one above. You can see the base of the pizza oven in the center of the picture.

The pump house it's roof completed in this picture. To the left, is the carport.

This shows the back of the house with the pump house tucked in the corner. Fresh repello is on the wall o the right.

This is the guest bathroom. You can see the rough plumbing for the tub and shower to the right, toilet, then the sink.

Looking into the guest bedroom from the hallway.

The tubing in the dirt holds electrical connections for the electrical outlets in the master bedroom. This will all be covered with concrete and then tile. Serina heads for the door of the walk in closet.

Serina contemplates the view from the shower area in the master bathroom. This will have glass blocks set in place shortly.