Main electrical lines are run
The main electrical lines have been run to the utility wall which is out by the road.

Here you see conduit getting ready to be stuffed with 220v lines. It will then be laid in the trench which goes into the main service panel which is located inside the walk in closet.

This is a view towards the road. In the background, center, you can see the men working near the utility wall.

Serina peruses the area by the pizza oven construction.

Work continues on the chimney. Felix preps it to receive the top that will hopefully let smoke out and keep the rain and wind from getting in.

Violet inspects the base of the pizza oven. Serina looks for food dropped by the workers.

Juan smoothes out a window opening in the guest bedroom. All the window openings have to be worked this way prior to the arrival of the window company to take measurements.