Cement floors, oven bricks, and column lights
Monday brings cement to some of the floors.

This shows how the steel rods are held up by concrete rows.

This shows the master bedroom floor poured. The amber glow to the left is coming from the walk in closet.

The pizza oven starts to get it's dome formed with bricks and fire cement for the wider spaces.

Cecilio is on the left and Edwin stands with his hand on the column. The newly installed column lamps are tested.