Sliding doors, tile work, and a refrigerator too

 

Persianas came today and installed the glass sliding doors in the great room.  They also put the half round window in the south wall.  Meanwhile tile work continues in the great room.

 

Lechada or grout is being applied to tiles in the great room.

 

 

Violet tries to suck Rodrigo into making a mosaic pattern on the utility sink in the laundry room.

 

 

One of the men from Persianas preps the half round window opening.

 

 

Work begins on the glass sliding doors.

 

The glass is put into place.

 

Another view of the glass installation.  It takes two men to do this, one on each side.

 

 

The refrigerator, a Samsung side by side 21 cubic footer with ice maker and water dispenser, got delivered today.

 

 

Serina cruises the hallway.

 

 

The great room has it's sliding doors in place.

 

A view from the top of the retaining wall shows the sliding doors in the patio.

 

 

This pullback shows the pizza oven on the edge of the house.

 

Return to Index